NEW QUESTION 28
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?

  • A. Use batch determination.
  • B. Use the material where-used report.
  • C. Use the material staging report.
  • D. Use the batch information cockpit.

Answer: D

 

NEW QUESTION 29
What are pillars of SAP Activate?
There are 2 correct answers to this question.
Response:

  • A. SAP Best Practices
  • B. SAP MaxAttention
  • C. Premium engagement
  • D. Guided Configuration

Answer: A,D

 

NEW QUESTION 30
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand.
Which is the appropriate planning strategy to use?
Response:

  • A. 50 - Planning without final assembly
  • B. 40 - Planning with-final-assembly
  • C. 20 - Make to order production
  • D. 10 - Anonymous make-to-stock

Answer: B

 

NEW QUESTION 31
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.

  • A. Lot size
  • B. Purchase orders
  • C. Maximum stock level
  • D. Safety stock

Answer: A,D

 

NEW QUESTION 32
Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Warehouse task
  • B. Outbound delivery request
  • C. Warehouse order
  • D. Outbound delivery order

Answer: B

 

NEW QUESTION 33
When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
Response:

  • A. You require an up-to-date inventory for components
  • B. For production lines with short lead times
  • C. When goods issues can wait for final confirmation
  • D. When you need to determine the work in progress

Answer: C,D

 

NEW QUESTION 34
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment?
There are 2 correct answers to this question.
Response:

  • A. Vendor consignment
  • B. Subcontracting
  • C. Stock transfer
  • D. In-house production

Answer: C,D

 

NEW QUESTION 35
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements only if the work center has sufficient capacity.
  • B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • C. MRP creates capacity requirements without checking the capacity of a work center.
  • D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.

Answer: C

 

NEW QUESTION 36
In which customizing activity do you set up automatic routing selection for production orders?
Please choose the correct answer.
Response:

  • A. Define scheduling parameters for production orders
  • B. Define selection profiles
  • C. Define order-type-dependent parameter
  • D. Define production scheduling profile

Answer: C

 

NEW QUESTION 37
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?

  • A. Supply Network Planning (SNP)
  • B. Capacity Requirements Planning (CRP)
  • C. Material Requirements Planning (MRP)
  • D. Demand Planning (DP)

Answer: C

 

NEW QUESTION 38
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work center capacities chart
  • B. Order (pool) chart
  • C. Capacity requirements chart
  • D. Orders (dispatched) chart

Answer: A,C

 

NEW QUESTION 39
How Is the bill of material (BOM) exploded when you use a BOM explosion number?
Please choose the correct answer.
Response:

  • A. With respect to a common key date for product and each assembly
  • B. With respect to a defined separate change status for product and each assembly
  • C. With respect to defined separate key dates for product and each assembly
  • D. With respect to a common change status for product and each assembly

Answer: C

 

NEW QUESTION 40
Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP?
There are 2 correct answers to this question.
Response:

  • A. Setup time
  • B. Float before and float after production
  • C. Opening period
  • D. Goods receipt processing time

Answer: A,B

 

NEW QUESTION 41
Which technological advances enabled the development of SAP S/4HANA as the digital core?
There are 3 correct answers to this question.
Response:

  • A. Advances in the three-tier architecture approach
  • B. Wide adoption of web standards such as Service oriented architecture
  • C. Capability to add to server landscape and scale
  • D. Big and affordable memory
  • E. Multi core processors enabling parallelism of tasks

Answer: C,D,E

 

NEW QUESTION 42
Which task list types can have parallel sequences?
There are 2 correct answers to this question.
Response:

  • A. Master recipes (2)
  • B. Reference operation sets (S)
  • C. Rate routings (R)
  • D. Routings (N)

Answer: C,D

 

NEW QUESTION 43
Which of the following is a valid sequence of the main activities in product on order processing?

  • A. Creation, staging, release, material withdrawal, confirmation
  • B. Creation, scheduling, release, variance calculation, confirmation
  • C. Creation, scheduling, release, material withdrawal, confirmation
  • D. Creation, release, scheduling, material withdrawal, confirmation

Answer: C

 

NEW QUESTION 44
Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers to this question.
Response:

  • A. Slotting
  • B. Handling Unit Management
  • C. Expected goods receipt
  • D. Labor Management
  • E. Yard Management

Answer: A,C,D

 

NEW QUESTION 45
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

  • A. Top of Red
  • B. Top of Yellow
  • C. Top of Red Base
  • D. Top of Green

Answer: D

 

NEW QUESTION 46
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?
Response:

  • A. It enables the propagation of network alerts across the bill of materials structure
  • B. It links receipts from an alternative location in case of a shortage in the default location
  • C. It replaces fixed pegging relationships unless they have been created for stock
  • D. It propagates changed sales order priorities to the pegged planned orders

Answer: B

 

NEW QUESTION 47
What does the industry sector determine? Note: There are 2 correct answers to this question.

  • A. Whether a material master field is required, changeable, displayed, or hidden
  • B. Which material master views can be maintained
  • C. Whether material numbers are assigned internally or externally
  • D. Which transaction you can use to create a new material

Answer: A,B

 

NEW QUESTION 48
Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question.
Response:

  • A. Enter time-ticket confirmation for production orders
  • B. Change planned order quantities
  • C. Undo for drag & Drop planning activities
  • D. Change sales order quantities

Answer: B,C

 

NEW QUESTION 49
......