NEW QUESTION 47
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?
- A. Total planning online
- B. Multi-level single-item planning with the "simulation mode" option
- C. Multi-level single-item planning with the "display material list" option
- D. Interactive single-item planning for the delayed assembly
Answer: B
NEW QUESTION 48
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)
- A. Availability check
- B. Resource selection
- C. Digital signature
- D. Electronic batch record
- E. Approved master recipes
Answer: C,D,E
NEW QUESTION 49
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)
- A. Reducing the order quantity
- B. Confirming the operation
- C. Setting the status technically complete (TECO)
- D. Rescheduling the operation
- E. Posting the goods receipt for the production order
Answer: A,B,C
NEW QUESTION 50
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default.
However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?
- A. The planning horizon is set in Customizing using the plant parameter setting and variant entries are assigned via the MRP groups for the materials in question.
- B. The planning horizon is set in the MRP groups in Customizing and variant entries are assigned via the plant parameter settings.
- C. The planning horizon is set in the plant parameters in Customizing and variant entries are stored in the material masters for the materials in question.
- D. The planning horizon is set in the MRP groups in Customizing and the variant values are stored in the material masters for the materials in question.
Answer: A
NEW QUESTION 51
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?
- A. Lead time scheduling cannot take place.
- B. Requirements planning creates an appropriate exception message in basic dates scheduling.
- C. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
- D. Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling.
Answer: D
NEW QUESTION 52
What master data do you need for material replenishment using the KANBAN procedure? (Choose two)
- A. Control cycle
- B. Production supply area
- C. Product cost collector
- D. Production version
- E. Rate routing
Answer: A,B
NEW QUESTION 53
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
- A. It posts planning results to the database automatically.
- B. It triggers multilevel bottom-up scheduling.
- C. It propagates exception messages from a component to the finished product.
- D. It calculates the delay time which may occur in planning.
Answer: D
NEW QUESTION 54
In which scenario will the error message shown in the attached screenshot occur?
Exhibit:
Exhibit
- A. The selection method is set to "selection only by production version" in the material master.
- B. A valid routing exists, but the material master is set to manual routing selection.
- C. A valid routing exists, but the Customizing for the order type is set to manual routing selection.
- D. The routing is not valid at the explosion date.
Answer: D
NEW QUESTION 55
For which of the following objects can you enter a confirmation? (Choose two)
- A. Trigger Point
- B. Work Center
- C. Production order operation
- D. Production order
Answer: C,D
NEW QUESTION 56
Where can you define the valid receivers for production order costs?
- A. In the valuation variant
- B. In the production scheduling profile
- C. In the settlement profile
- D. In the costing variant
Answer: C
NEW QUESTION 57
You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC.
On which specifications is the dynamic safety stock calculation based?
- A. The static safety stock and the material forecast
- B. The average daily demand and the desired range of coverage
- C. The static safety stock per day and the safety time
- D. The average daily demand and the safety time
Answer: B
NEW QUESTION 58
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?
- A. Activate the availability check and assign an overall profile in the production scheduling profile.
- B. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked.
- C. Activate the availability check and assign an overall profile in the checking control of the order type / plant combination.
- D. Assign an appropriate availability checking rule to the material master for the product.
Answer: C
NEW QUESTION 59
What do you have to consider regarding ATP checks in SAP ECC that are triggered from customer orders?
- A. An ATP check creates fixed links between customer orders and their confirmed receipts.
- B. The ATP quantity is the available quantity that can be used to confirm incoming customer orders.
- C. If the ATP check determines non-availability, it then checks in the next step whether timely procurement or production is possible.
- D. The ATP check does not take stocks and receipts into account. It checks consumption of planned independent requirements.
Answer: B
NEW QUESTION 60
You want to enhance the system statuses of a production order with user statuses.
How do you do this?
- A. Define the user statuses in the Customizing table of the system statuses.
- B. Define a status profile in Customizing and assign it to the production scheduling profile.
- C. Define the user statuses in the order type-dependent parameters.
- D. Define a status profile in Customizing and assign it to the order type.
Answer: D
NEW QUESTION 61
The company you advise wants to carry out the material availability check automatically in the production order at various points in time. Which of the following options would you recommend? (Choose two.)
- A. Goods receipt for a missing part
- B. Release of the production order
- C. Creation of the production order
- D. Goods receipt for the product produced with the order
- E. Confirmation of the operation that the materials being checked are assigned to
Answer: B,C
NEW QUESTION 62
What are characteristics of repetitive manufacturing? (Choose three)
- A. Production without using production orders and without status management
- B. Continuous material consumption, production flow and output
- C. Shop fabrication
- D. Automatic line loading based on capacity limits across all production lines
- E. Period-based planning of the quantities to be produced
Answer: A,B,E
NEW QUESTION 63
You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?
- A. Sales and operations planning -> Demand management -> Long-term planning -> Material requirements planning -> Capacity planning
- B. Demand management -> Sales and operations planning -> Capacity planning -> Long-term planning -> Material requirements planning
- C. Material requirements planning -> Demand management -> Sales and operations planning -> Long-term planning -> Capacity planning
- D. Long-term planning -> Sales and operations planning -> Demand management -> Material requirements planning -> Capacity planning
Answer: A
NEW QUESTION 64
What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)
- A. LTP focuses on the operational planning of important components.
- B. LTP creates purchase requisitions for external procurement.
- C. A planning scenario must be released before it can be used in LTP.
- D. Reorder point planned materials can be included in LTP.
Answer: C,D
NEW QUESTION 65
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three)
- A. Automatic selection of the production version in material requirements planning (MRP) using the selection methods setting
- B. Automatic selection of the production version by applying quota arrangement records in material requirements planning (MRP)
- C. A planning algorithm from capacity planning
- D. Manual assignment of planned production quantities in a planning table
- E. Automatic selection of the production line assigned to the MRP group used during material requirements planning (MRP)
Answer: A,B,D
NEW QUESTION 66
In your company planning strategies are used in the SAP-ECC demand management that are based on consumption. Which of the following statements about consumption is true?
(Choose two.)
- A. A consumption situation is dynamic and is always restructured with the planning run.
- B. The consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
- C. Consumption can also take place between order reservations and planned independent requirements, depending on the strategy.
- D. Consumption always takes place on the material level between the planned independent requirements and the planned orders.
Answer: B,C
NEW QUESTION 67
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.)
- A. Production Scheduling Profile
- B. Material Master (Finished Product)
- C. Routing
- D. Material Master (Component)
- E. Work Center
Answer: C,D,E
NEW QUESTION 68
What data can be posted directly via the Plant Data Collection (PP-PDC) interface?
- A. Maintenance notifications
- B. Goods issues
- C. Confirmations
- D. Goods receipts
Answer: C
NEW QUESTION 69
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).
Which of the following properties for the resulting dependent requirements applies?
- A. If the individual material components are explicitly assigned to the operations of a routing, the requirement dates of the dependent requirements are scheduled at each start date of the operations.
- B. When a customer order is created for the finished material, the dependent requirements are automatically triggered for the components in the bill of material without a planning run.
- C. In multi-level backward scheduling, dependent requirements are triggered at the start date for the planned order of the finished material.
- D. In multi-level backward scheduling, dependent requirements are calculated to the exact second.
Answer: C
NEW QUESTION 70
......