MB-320 Training & Certification Get Latest Microsoft Dynamics 365 Updated on Oct 17, 2021 [Q67-Q89]

Share

MB-320 Training & Certification Get Latest Microsoft Dynamics 365 Updated on Oct 17, 2021

Certification Training for MB-320 Exam Dumps Test Engine

NEW QUESTION 67
You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item.
The item has the following Lean setup:
* The setup uses a Lean schedule group with a throughput ratio=2
* The process activity tied to production flow has the following runtime activity times: time=3 min, per quantity=1
* The work cell capacity has a model type of Throughput and an average throughput quantity of 60 per a capacity period of standard workday (8-hour day)
* The throughput is 10 per hour
You need to set up a Discrete operation to mirror the item's production flow activity.
What should you do?

  • A. Create a route with a runtime =1, a process quantity =10, and the operation's hours/time =1
  • B. Create a route with a runtime =6, a process quantity =1, and the operation's hours/time =1
  • C. Create a route with a runtime =1, a process quantity =6, and the operation's hours/time =1
  • D. Create a route with a runtime =10, a process quantity =6, and the operation's hours/time =1

Answer: A

 

NEW QUESTION 68
You are a production manager at a company that has implemented lean manufacturing using Dynamics 365 for Finance and Operations. You have created a new Kanban rule to replace one that is expiring. You need to determine the impact to the existing process jobs. How are the active Kanbans of the expired rule handled?

  • A. The active Kanbans are cancelled.
  • B. The active Kanban handling units are registered as empty and new Kanbans are created.
  • C. The active Kanbans are set to add to the requested period and distribute for the replacement rule time fence.
  • D. The active Kanbans are counted as Kanbans of the replaced rule.

Answer: C

 

NEW QUESTION 69
A company produces various products using Process manufacturing.
The manufacturer makes two co-products from a formula and rarely produces the primary formula item. The costs of making the co-products are inflated. The manufacturer must update the costs of producing the co- products and change the formula to not produce the primary formula item.
You need to change the primary formula item type.
What should you do?

  • A. Change the cost of the primary formula item to zero and then recalculate the item cost
  • B. Change the production type to Bill of materials and recalculate the item cost
  • C. Associate the costs to produce by-products with the items
  • D. Change the primary formula item to use the planning item type

Answer: D

Explanation:
Section: Create, process, and manage production batch orders

 

NEW QUESTION 70
You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.
You need to set up a new item for the car audio system.
How should you create the new product? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 71
You are the product definition manager for a car manufacturing company. You set up and maintain the production configuration models used at the company.
You must build a new configuration model and include constraints in the model.
You need to determine which constraint type to use for each scenario.
Which constraint type should you use? To answer, drag the appropriate constraint types to the correct scenarios. Each constraint type may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/build-product-configuration-model

 

NEW QUESTION 72
A company uses a make-to-stock strategy for their key production components.
The number of active Kanbans for these components must be constant.
You need to configure a new Kanban rule.
How should you set up the Kanban type and replenishment strategy? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 73
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 for Finance and Operations for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
* Edit the existing production flow and set the expiration date to the end of the month.
* Using the existing production flow, create a production flow and version. Set the expiration date to the end of the month. Create an activity for the new process step and add it in the proper sequence.
* Create a Kanban rule that uses the last day of the month as the effective date.
* Edit the existing Kanban rule. Set the expiration date to the end of the month. Set the new Kanban rule as the replacement Kanban rule.
* Activate the new production flow.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

 

NEW QUESTION 74
A company implements Dynamics 365 for Finance and Operations. You must use functionality in the system for group production runs to prevent downtime and excessive cleaning of the machines on the production line.
You need to set up the system.
Which behaviors should you expect? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 75
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses batch tracking of raw materials, semi-finished goods, and finished goods.
It is difficult to determine when semi-finished and finished goods were produced and expired.
You need to incorporate automatic batch expiration dates for tracked items that are produced.
Solution:
1. Assign shelf life period in days to the items that require expiration dates.
2. Create a new reservation hierarchy that places batch at one.
3. Assign the new reservation hierarchy to the items that require expiration dates.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

 

NEW QUESTION 76
A company produces lotions for pain relief and uses Dynamics 365 for Finance and Operations.
You have been provided the following information for a new relieving lotion.

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 77
You are the production scheduler at a manufacturing company. You schedule estimated production orders and ensure that capacity is used efficiently.
You have an order that must be scheduled at the resource group level and scheduled backward from the delivery date specified on the production order.
You need to schedule the order.
Which scheduling parameters should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/operation-sch

 

NEW QUESTION 78
A company uses Process manufacturing.
You need to review formulas and how the different ingredient types impact the batch balancing process.
Which ingredient types should you use? To answer, drag the appropriate ingredient types to the correct scenarios. Each ingredient may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/batch-balanci

 

NEW QUESTION 79
You are a functional consultant for Contoso Entertainment System USA (USMF).
You need to configure the system to ensure that planned master orders generated by Material Requirements Planning (MRP) contain trade agreements.
To complete this task, sign in to Dynamics 365 portal.

Answer:

Explanation:
See explanation below.
* Navigate to the Master Planning Parameters Setup > Master Planning
Parameters).
* Select the Planned Orders
* Select the Find Trade Agreements option.
* Save the changes.
Reference:
https://docs.microsoft.com/en-us/learn/modules/configure-use-master-planning-dyn365-supply-chain-mgmt/03-p

 

NEW QUESTION 80
A company plans to account for indirect costs related to materials used to manufacture products.
The items used to manufacture products have surcharge rates that depend on the type of product being used.
You need to set up the costing sheet to include surcharges for specific items.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 81
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 for Finance and Operations for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
1.) Add a new version to the existing production flow. Set the expiration date to the end of the month.
2.) Create an activity for the new process step and add it in the proper sequence
3.) Create a Kanban rule that incorporates the new activity. Set the expiration date to the end of the month.
4.) Edit the existing Kanban rule. Set the expiration date to the end of the month. Specify the new Kanban rules as the replacement rule Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

Explanation:
Section: Create and manage production and lean orders

 

NEW QUESTION 82
A company manufactures automobile engines.
You must create product configurations for values that are used in different types of engines. Each value is based on a master valve design. Different gaskets and fittings are used to allow valves to work with different engines.
You need to translate production plans into Dynamics 365 Finance and Operations elements.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 83
A company that uses Lean manufacturing concepts to produce paper plates has redesigned the layout of the warehouse and production floor.
The company's production flow activities no longer match the tasks of the workers. Employees use paper and manual communication to complete the tasks.
You need to update the production flows to match their current processes by deactivating the obsolete production flows and creating new ones.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 84
You maintain responsible resource calendars and production orders for a manufacturing company. All production resources use the same production calendar.
A machine in the facility is defective and must be closed for repairs for the next two days.
You need to configure the resource calendar to close the resource for production for the next two days.
What should you do?

  • A. Navigate to the resource group. Change the calendar to closed on the resource group.
  • B. Navigate to the resource. Change the calendar to closed on the resource.
  • C. Navigate to the resource and select Calendar deviations. Set the calendar to closed for the next two days.
  • D. Navigate to the calendar used for production and close the next two days.

Answer: C

 

NEW QUESTION 85
A company plans to implement routing and route postings.
You must direct postings of route cards based upon the route groups at Report as finished.
You set the start default order setting for route posting to Never and the Report as finished setting to Route Group Dependent.
You set up the route group as shown below.

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 86
A company uses Dynamics 365 Process manufacturing.
Employees work a half day so that they can attend a company event. You have a rush order that must be completed that same day.
After reviewing the net requirements of the batch order, only 400 of the total quantity of 1400 units must be completed today. The production manager must retain the original batch number as the quantity of 400. The original batch number must appear on documentation for the customer.
You need to split the batch order into two orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

 

NEW QUESTION 87
A customer produces light projection toys for holiday decorations throughout the year.
You are in the first month of a season. Production flows take one day to complete.
The floor supervisor reports that seasonal production targets will not be met. You review the Kanban schedule board and identify thousands of unplanned jobs.
You need to plan the jobs to be completed two weeks prior to the start of the next season.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

  • A. Manually schedule each unscheduled job forward from the date of the end of the season.
  • B. Set the Automatic planning option for each unscheduled job to No.
  • C. Manually schedule each unscheduled job on its due date.
  • D. Set the Automatic planning option for each unscheduled job to Yes.
  • E. Manually schedule each unscheduled job to the next period of the start of the next season.

Answer: A,C

Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/lean-manufacturing-kanban-job-

 

NEW QUESTION 88
A company makes lubricants and greases used in the automotive industry. The company plans to implement Dynamics 365 for Finance and Operations. The system must meet the following requirements:
* Schedule the batch production of products.
* Plan for inventory fluctuations of ingredients that are used across different products.
* Schedule delivery of amounts of proprietary compounds used during production from vendors to keep production runs on schedule and eliminating excess stock on hand or delayed production.
The company is starting the initial setup of their Dynamics 365 environment.

Answer:

Explanation:

 

NEW QUESTION 89
......

Step by Step Guide to Prepare for MB-320 Exam: https://www.itpass4sure.com/MB-320-practice-exam.html

Microsoft Dynamics 365 MB-320 Real Exam Questions and Answers FREE Updated: https://drive.google.com/open?id=1e0NtuxVb9_JPEI8Sj6b1k8hvYlg4Rt0h