Using the lumen method, calculate the number of luminaires (fixtures) required to light a room to 200 lux.
Each luminaire has 2 fluorescent lamps, 3,000 lumens per lamp. The room is 20 meters by 30 meters. The total light loss factor (LLF) is 0.70 and the luminaire coefficient of utilization (CU) is 0.80.
- A. 48 luminaires
- B. 60 luminaires
- C. 24 luminaires
- D. 36 luminaires
- E. 12 luminaires
Answer: C
NEW QUESTION # 70
A high-pressure steam system passes 180°C condensate (saturated liquid) through a steam trap to an atmospherically vented condensate receiver tank. If the steam trap is working properly, how much of the condensate mass can be lost out the vent of the receiver tank in the form of flash steam?
- A. 15%
- B. 66%
- C. 6%
- D. 100%
- E. 25%
Answer: E
NEW QUESTION # 71
What type of heat transfer is reduced by adding insulation to the inside surface of a wall?
- A. Radiation
- B. Convection
- C. Conduction
Answer: C
NEW QUESTION # 72
A 100-kW electrical load has a power factor of 75%. What capacitance, in KVAR, will improve the power factor to 95%?
- A. 45.2 kVAR
- B. 55.3 kVAR
- C. 15.7 kVAR
- D. 25.3 kVAR
- E. 33.1 kVAR
Answer: D
NEW QUESTION # 73
A cooling tower delivers 29°C water to a central chilled water plant. The cooling tower is capable of delivering water to the chilled-water plant with a 6°C approach temperature to the ambient wet bulb temperature. Using this information, what type of control strategy would you recommend be added to the cooling tower operation to save additional energy?
- A. Chiller demand limiting
- B. Chilled-water temperature reset
- C. Static-pressure reset
- D. Condenser-water temperature reset
Answer: D
NEW QUESTION # 74
Calculate the monthly electric bill for a customer that used 400 kW and 75,000 kwh during one month. Use the following declining block structure for a monthly bill:
SELECT THE CORRECT ANSWER
- A. $7,850
- B. $9,660
- C. $3,280
- D. $4, 580
- E. $12,500
Answer: B
Explanation:
We need to calculate the monthly electric bill based on the given pricing structure.
Step 1: Identify Charges from the Table
* Customer charge:$50/month
* Peak demand charge:$10/kW-month
* Electric consumption charges:
* First25,000 kWh@$0.06/kWh
* Excess(75,000 - 25,000) = 50,000 kWh@$0.05/kWh
* Tax:20% of total
A screenshot of a calculator AI-generated content may be incorrect.
NEW QUESTION # 75
Which of the following statements best describe Demand Control Ventilation (DVC) in Building Automation Systems?
- A. It satisfies indoor ventilation rates by preconditioning outdoor air with the exhaust air to decrease energy cost during cold, warm, or humid weather
- B. It's an active evaluation of outdoor and indoor space conditions to determine the amount of thermal, mechanical and natural conditioning that is required
- C. It's a building standard for enclosed spaces in which biological, chemical, and physical contaminants are considered to meet thermal comfort requirements
- D. It's a prescriptive procedure in which outdoor air intake rates are calculated based on the energy cost method that compares a proposed building design to a base annual energy cost design
Answer: B
NEW QUESTION # 76
A 50-Hz alternating current (AC) induction motor has 3 pole pairs (6 poles). What is the synchronous speed of the motor?
- A. 1,000 rpm
- B. 600 rpm
- C. 750 rpm
- D. 1,500 rpm
Answer: D
NEW QUESTION # 77
Which of the following is NOT a renewable-energy resource?
SELECT THE CORRECT ANSWER
- A. Crop residue
- B. Ocean waves
- C. Shale gas
- D. Saw grass
- E. Geothermal heat
Answer: C
Explanation:
Renewable energy resources are naturally replenished on a human timescale. Let's evaluate each option:
A:Saw grass:A biomass resource, renewable through regrowth.
B:Shale gas:A fossil fuel extracted from shale formations, non-renewable.
C:Geothermal heat:Energy from Earth's internal heat, renewable.
D:Ocean waves:Mechanical energy from ocean surface waves, renewable.
E:Crop residue:Organic materials from agriculture, renewable.
Conclusion:
Shale gas is not a renewable energy resource. Therefore, the correct answer is B.
NEW QUESTION # 78
A new lighting system costs $60,000. The new lighting system has a 15-year life and the minimum required rate of return (MARR) is 15%. How much must the new lighting system save to be life-cycle cost effective?
- A. $12,556/year
- B. $15,650/year
- C. $33,200/year
- D. $27,090/year
- E. $10,260/year
Answer: A
NEW QUESTION # 79
An energy-saving project costs $540,000. The project will have maintenance costs of $25,000 per year. The energy savings from the project are $160,000 per year. What is the simple payback of the project?
- A. 5.0 years
- B. 2.0 years
- C. 3.0 years
- D. 4.0 years
Answer: D
Explanation:
To determine the simple payback period for the energy-saving project, we need to apply the standard formula used in energy management as per the Association of Energy Engineers (AEE) Certified Energy Manager (CEM) guidelines. The simple payback period is a widely used metric in energy efficiency projects to evaluate how long it takes for the initial investment to be recovered through net savings. Let's break this down step-by-step using the provided data and CEM-aligned methodology.
Step 1: Understand the Simple Payback Formula
* Formula: Simple Payback Period (years)=Initial Investment CostNet Annual Savings\text{Simple Payback Period (years)} = \frac{\text{Initial Investment Cost}}{\text{Net Annual Savings}} Simple Payback Period (years)=Net Annual SavingsInitial Investment Cost
* Definition: The simple payback period represents the time (in years) required for the cumulative savings to equal the initial investment, without considering the time value of money (e.g., discount rates or inflation).
* CEM Reference: AEE CEM training materials emphasize this formula in the "Energy Economics" section, where simple payback is a fundamental tool for assessing project feasibility.
Step 2: Identify Given Data
* Initial Investment Cost: $540,000 (one-time cost of the project).
* Annual Energy Savings: $160,000 per year (benefit from the project).
* Annual Maintenance Costs: $25,000 per year (additional cost incurred due to the project).
* Net Annual Savings: This must account for both the savings and the costs incurred annually.
Step 3: Calculate Net Annual Savings
* Definition: Net annual savings is the difference between the annual energy savings and any additional annual costs (e.g., maintenance).
* Verification: The problem specifies maintenance costs as an ongoing expense tied to the project, which reduces the effective savings. CEM guidelines require including such costs in payback calculations unless explicitly stated otherwise.
Step 4: Compute the Simple Payback Period
* Apply the Formula: Simple Payback Period=Initial Investment CostNet Annual Savings\text{Simple Payback Period} = \frac{\text{Initial Investment Cost}}{\text{Net Annual Savings}} Simple Payback Period=Net Annual SavingsInitial Investment Cost Simple Payback Period=540,
000135,000=4.0 years\text{Simple Payback Period} = \frac{540,000}{135,000} = 4.0 \, \text{years} Simple Payback Period=135,000540,000=4.0years
* Result: The payback period is exactly 4.0 years, meaning it takes 4 years for the net savings to recover the initial investment.
Step 5: Validate Against Options
* Options:A. 2.0 yearsB. 3.0 yearsC. 4.0 yearsD. 5.0 years
* Check:
* If we ignored maintenance costs (incorrectly), payback would be 540,000160,000=3.375 \frac
{540,000}{160,000} = 3.375 160,000540,000=3.375 years, which rounds to 3.4-not an exact match for any option.
* With maintenance costs included, 540,000135,000=4.0 \frac{540,000}{135,000} = 4.0
135,000540,000=4.0, which matches option C precisely.
* Conclusion: Option C (4.0 years) is correct based on the net savings approach.
NEW QUESTION # 80
According to the institute of Electrical and Electronic Engineers (IEEE) standard 519. "Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems." the maximum total harmonic distortion (THD) for general low voltage systems less than 600 votts) should be:
SELECT THE CORRECT ANSWER
- A. Less than 5%
- B. Less than 20%
- C. Less than 1%
- D. Greater than 1%
- E. Less than 10%
Answer: A
Explanation:
The Institute of Electrical and Electronics Engineers (IEEE) Standard 519, titled "Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems," sets forth guidelines to maintain the quality of electrical power by limiting harmonic distortions. According to IEEE 519, for general low-voltage systems (defined as systems with a voltage less than 600 volts), the Total Harmonic Distortion (THD) of the voltage waveform should not exceed 5%. This threshold ensures the reliable operation of electrical equipment and minimizes potential issues such as overheating or malfunctioning caused by excessive harmonics.
Therefore, the correct answer is C. Less than 5%.
NEW QUESTION # 81
A 55-kW motor at full load is used to drive a pump that generates 50 meters of head while pumping water at a rate of 5,000 liters per minute. Calculate the pump efficiency.
- A. 88%
- B. 74%
- C. 62%
- D. 58%
Answer: B
NEW QUESTION # 82
A 50-kW induction motor (1,500 rpm synchronous speed) has a nameplate full-load rotational speed of 1,455 rpm. Field measurements show the actual rotational speed is 1,475 rpm. Using the slip method, calculate the partial load factor of the motor.
- A. 56%
- B. 80%
- C. 98%
- D. 101%
- E. 46%
Answer: B
NEW QUESTION # 83
What is the best type of heat exchanger to recover and transfer latent heat energy from one air stream to another?
- A. Run-around system
- B. Heat pipe
- C. Desiccant heat wheel
- D. Ceramic recuperator
- E. Shell and tube
Answer: C
NEW QUESTION # 84
Which is the best application for variable-speed drives?
- A. Reciprocating air compressor
- B. Waste-water sewer lift pump
- C. Centrifugal fan motor in a multi-zone air conditioning system
- D. Centrifugal fan motor in a variable-air volume air-conditioning system
Answer: D
NEW QUESTION # 85
Using an interest rate of 15%, an energy project has a net-present value (NPV) of $3,500. Which statement is true about the project's internal rate of return (IRR)?
- A. IRR = 15%
- B. IRR < 15%
- C. IRR > 15%
- D. IRR < 0%
Answer: C
NEW QUESTION # 86
......
Feel AEE CEM Dumps PDF Will likely be The best Option: https://www.itpass4sure.com/CEM-practice-exam.html
New 2025 CEM Sample Questions Reliable CEM Test Engine: https://drive.google.com/open?id=1AauEhqroMMUhVKloM1XieeFRO5ws3ccf