  • Analyze the SUT responses during test executionto steer subsequent test runs
  • Understanddesign considerations for a TAA
Topic 2
  • Ability to trace the generated tests back to the model
  • Explaintherole that layers play within a TAA
Topic 3
  • Set up and tear down the SUT for test execution
  • Design the appropriateTAAfor a given project
Topic 4
  • Defining test scripts for the execution of the test case
  • Set up and tear down test suites
Topic 5
  • Specify test sequences or fully-fledged test behaviors
  • Analyze factors of implementation, use, and maintenancerequirementsfor a given TAS
Topic 6
  • Understand "design for testability" and "design for test automation" methodsapplicable to the SUT
  • Analyze a system under test to determine theappropriateautomation solution
Topic 7
  • Relate test cases to test objectives or SUT requirements
  • Configure and parameterize the test setup
Topic 8
  • Explain the factors to be considered when identifyingreusability of components
  • Interpret both test data and test cases and transform them into executable scripts
Topic 9
  • Developing, capturing, or deriving test data
  • Providing access to test libraries as needed

 

NEW QUESTION 23
As a TAE you are evaluating a functional test automation tool that will be for several projects within yourorganization. The projects require that tool to work effectively and efficiently with SUT's in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.
Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?
* Is the test automation tool able to launch processors and execute test cases on multiple machines in
* different environments?
* Does the test automation tool support a licensing scheme that allows accessing different sets?
* Does the testautomation tool have a large feature set, but only part of the features will be sets?
* Do the release notes for the planned updates on existing specify the impacts on their interfaces to other tools?
Does the test automation tool need to install specific libraries that could impact the SUT?

  • A. A and C
  • B. B and E
  • C. C and D
  • D. A and E

Answer: B

 

NEW QUESTION 24
You are working on a TAS for standalone application. The automated tests are developed based on a automation framework that allows interaction with GUI elements using on object orientated API. The GUI elements include menus, buttons, radio buttons, text toolbars and their properties.
Whilst automating a test, you have discovered that the GUI elements of some third party components are not identifiable by the automated tool you are using.
Which of the following is the FIRST stepthat you take to investigate this issue?

  • A. Verify whether naming standards for variables and have been defined for the current automation solution
  • B. Verify the testability support with the providers of the third party components
  • C. Adopt an approach that uses the coordinates of the GUI elementsinstead
  • D. Verify whether the GUI identification depends on the browser.

Answer: B

 

NEW QUESTION 25
A project consists of distributed teams working in a 24-hour environment, where activities happen at all hours of the day. This project adopts a CI (Continuous Integration) process when developer check-in code and consists of automated activities that include generating a build and deploying it to a test environment.
Automated integration tests are run multiple times a day. The project have asked for a report containing the automation test results for every build, which must be available 24/7 to the project team.
Which of the following would be the BEST way to automatically provides this report?

  • A. Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds), use this database to automatically update a dashboard containing the build history and test results accessible to the project team.
  • B. Store the execution result of the integration tests for the last build to a database (overwriting the results from the previous build), automatically create atest execution report for this build send It via e-mail to the project team
  • C. Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds). Automatically create a test execution report for this build and send it via e-mail to the project team
  • D. Store the code coverage results of the integration tests for the last build to a database (without overwriting the results from the previous builds). And automatically create a chart showing the trend in code coverage and send via email to the project team.

Answer: A

 

NEW QUESTION 26
A defect in a SUT has been resolved and validated by an automated defect re-test in the current release of the software. This retest has now been added to the automated regression test suite.
Which statement BEST describes a reason why this defect could re-occur in future releases?

  • A. The automated regression test suite is not run consistently for future releases.
  • B. Automated defect confirmation testing is not effective at confirming that the resolved defect will continue to work in future releases
  • C. The automated regression test suite has a narrower scope of functionality
  • D. Theconfiguration management process does not properly control the synchronization between software archives

Answer: D

 

NEW QUESTION 27
Your goal is to verify completeness, consistency and correct behavior of an automated test suite. The TAS has been proven to successfully install in the SUT environment. All the preliminary checks to verify the correct functioning of the automated test environment and test tool configuration, installation and setup have successfully completed.
Which of the following is NOT a relevant check for achieving your goal in this scenario?

  • A. Checking whether the post condition have been fulfilled for all the test cases
  • B. Checking whether theloading of the TAS is repeatable in the SUT environment
  • C. Checking whether all the test cases contain the expected results
  • D. Checking whether all the test cases produce repeatable outcomes

Answer: D

 

NEW QUESTION 28
Which of the following statements BEST describe aspects of the SUT to consider when designing a TAA?

  • A. All the interface of the SUT affected by the tests should be controllable by the TAA
  • B. All the external test interfaces of the SUT should be removed prior to the product release
  • C. All the interaction between SUT and TAS should be logged with the highest level of detail
  • D. All the internal test interfaces of the SUT should be removed prior to the product release

Answer: C

 

NEW QUESTION 29
Consider the following example of TAS metrics.
Time to execute automated tests
Speed and efficiency of TAS components
Which of the following statements is TRUE?

  • A. A and b are both external TAS metric
  • B. A and B are both internal TAS metrics
  • C. A is an internal TAS metric and B is an external TAS metric
  • D. A is and external TAS metric and b is an internal TAS metric

Answer: B

 

NEW QUESTION 30
The GUI of a Customer Relationship Management (CRM) application has been delivered through internet Explorer with proprietary Active X and Java controls. This implementation enables rich client capabilities, but specific commercial automation tools are necessary to automate test cases at GUI of functional test cases. This is to demonstrate whether a small set of the commercial are able to properly recognize actions taken by a tester when interacting with GUI of the CRM application.
Which of the following scripting techniques would be MOST suitable in this scenario?

  • A. Data-driven scripting
  • B. Linear scripting
  • C. Structure scripting
  • D. Keyword-driven scripting

Answer: C

 

NEW QUESTION 31
You are working on a TAS forstandaloneapplication. The automated tests are developed based on a automation framework that allows interaction with GUI elements using on object orientated API. The GUI elements includemenus, buttons, radio buttons, text toolbars and their properties.
Whilst automating a test, you have discovered that the GUI elements of some third party components are not identifiable by the automated tool you are using.
Which of the following is the FIRST step that you take to investigate this issue?

  • A. Verify whether naming standards for variables and have been defined for the current automation solution
  • B. Adopt an approach that uses the coordinates of the GUI elements instead
  • C. Verify whether the GUI identification depends on the browser.
  • D. Verify the testability support with the providers of the third party components

Answer: B

 

NEW QUESTION 32
Consider a TAS associated to dynamically changing software frequent releases. Your goal is todetermine the amount of effort required to maintain the automated tests of the regression test suite for each new release of the SUT.
What is the MOST important metric to collect to achieve your goal?

  • A. The number ofautomated tests requiring maintenance, for each new release of the SUT.
  • B. The time it takes to execute all the automated tests, for each new release of the SUT.
  • C. The number of automated tests which fail because of a single software defect, for each new release of the SUT
  • D. The code coverage achieved with the automated tests,for each new release of the SUT

Answer: C

 

NEW QUESTION 33
Consider a TAS that uses a keyword-driven framework. The SUT is a web application and there is a large set of keywords available for writing the automated tests that relate to highly specific user actions linked directly to the GUI of the SUT. The automated test written with the keywords are statically analyzed by a custom tool which highlight's repeated instances of identical sequence of keywords. The waiting mechanism implemented by the TAS for a webpage load is based on a synchronous sampling within a given timeout. The TAS allowschecking a webpage load everyseconds until a timeout value

  • A. Establishing an error recovery process for TAS and SUT
  • B. Changing the scripting approach to data-driven scripting
  • C. Changing the wait mechanism to explicit hard-coded waits
  • D. Implementing keywords with a higher level of granularity

Answer: D

 

NEW QUESTION 34
You are using a gTAA to create a TAS for a project. The TAS is aimed at automatically and executing test cases based on a use-case Modeling approaching that uses UML as a modeling language. All the interaction between TAS and SUT will only be at the API and GUI level.
Which of the following components of the gTAA would you EXCLUDE from the TAS?

  • A. The test execution (test engine of the test execution layer
  • B. The Command Line Interface (CLI) component of the test adaptation layer
  • C. The Test execution component of the test generation layer
  • D. The test reporting component of the test execution layer.

Answer: B

 

NEW QUESTION 35
You have been asked to automate a set of functional tests at system Test level via the CLI of the SUT for the first release of a software system. The automated tests will be delivered to the learn in change of maintenance testing, who will use them for part of the regression testing. They have the following requirements.
1.The automated tests must be as fast and cheap to maintain as possible
2.The cost of adding new automated tests must be as low as possible
3.The automated tests must have a high level of independence from the tool itself Which of the following scripting techniques would be MOST suitable?

  • A. Data-driven scripting
  • B. Linear scripting
  • C. Structure scripting
  • D. Keyword-driven scripting

Answer: C

 

NEW QUESTION 36
You are currently designing the TAA of a TAS. You have been asked to adopt an approach for automatically generating and executing test cases from a model that defines the SUT. The SUT is a state-based and event-driven that is described by a finite-state machine and exposes its functionality via an API. The behavior of the SUT depends on hardware and communication links that can be unreliable.
Which of the following aspects is MOST important when designing the TAA in this scenario?

  • A. Adopting a test definition strategy based on use case/exception case coverage for the definition layer.
  • B. Adopting a test definition strategy based on classification tree coverage for the test definition layer.
  • C. Looking for tools that allows direct denoting of exceptions and actions depending on the SUT events.
  • D. Looking for tools that allow performing setup and teardown of the test suites and the SUT.

Answer: D

 

NEW QUESTION 37
Consider thefollowing example of TAS metrics.
Time to execute automated tests
Speed and efficiency of TAS components
Which of the following statements is TRUE?

  • A. A and b are both external TAS metric
  • B. A is an internal TAS metric and B is an external TAS metric
  • C. A is and external TAS metric and b is an internal TAS metric
  • D. A and B are both internal TAS metrics

Answer: C

 

NEW QUESTION 38
Assume that you are the TAE responsible for the correct functioning of a TAS, deployed in a test environment that consists of a few machines running the same version of the operating system. The TAS has been working and stable since its deployment, it has been used to run an automated test suite consisting of many similar automated test. The infrastructure team is planning to update the operating system on these machines by installing a new the service pack for security reasons. Since the vendor of the operating system assurance full backward compatibility, the infrastructure team assurance that there will be no impacts on the functioning of the TAS.
What is the BEST approach to confirm the correct functioning of the TAS in this scenario?

  • A. Do not run any tests because you can immediately confirm the correct functioning of the automated test suite
  • B. Verify the behavior of the automated tests by running a small tests, then gradually run the remaining tests to confirm the correct functioning of the whole automated test suite.
  • C. Verify the behavior of the whole automated test suite by running all the automated tests
  • D. Make sure that the infrastructure team has completed installing the service pack on the machines where SUT is running, then run the whole automated test suite to verify its behavior

Answer: A

 

NEW QUESTION 39
A regression test suite consist of 500 test cases which are all executed manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lasted one month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.
Which of the following statements is TRUE in this scenario?

  • A. The project selected for the pilot is too critical -if should not be too critical or too trivial
  • B. The duration of the pilot project was too short -it should last unit the success factors are achieved
  • C. Thetarget defined for the business case seems difficult to hit - it should be realistic
  • D. The target defined for the business case is too accurate -it should not be measureable

Answer: C

 

NEW QUESTION 40
Consider a TAS deployed into production. The SUT is a web application and the test suite consists of a set of automated regression tests developed via GUI. A keyword-driven framework has been adopted for automating the regression tests. The tests are based on identification at low-levels of the web page components (e.g class indexes, tab sequence indexes and coordinates) in the next planned release the SUT will be subject to significant corrective maintenance (bug-fixes) and evolution (new features) Maintenance costs to update the test scripts should be as low as possible and the scripts must be highly reusable.
Which of the following statements is most likely to be TRUE?

  • A. False positive errors are likely to occur when running the automated tests on the new releases without modifying the test
  • B. The total execution time of the automated regression test suite will decrease for each planned release.
  • C. The keyword-driven framework is not suitable, it would be better to adopt a structured-scripting approach
  • D. The keyword-driven framework introduces a level abstraction that is too high and makes it difficult what really happens

Answer: C

 

NEW QUESTION 41
You are reviewing the testability of your SUT.
Which of the following BEST refers to the characteristic of OBSERVABILITY?

  • A. The ability of the SUTto perform its intended function for a specified period of time
  • B. The ability of the SUT to prevent unauthorized access to its components or data.
  • C. The abilityto identify states, outputs, intermediate result and error messages in the SUT
  • D. The ability to exercise the SUT by entering inputs, triggering events and invoking methods

Answer: C

 

NEW QUESTION 42
You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.
In the pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automationregimefor the tests is not yet mature.
Which of the following statements is TRUE?

  • A. The approach used for deployed this tool is aligned to the standard success factor for deployment
  • B. The test process should be radically changed to gain additional benefits from using the tool.
  • C. The pilot project should have been critical so that maximum benefits were delivered
  • D. The target defined for the project was inappropriate, because the automationregimeforthe automated tests at the end of the pilot is not yet mature.

Answer: B

 

NEW QUESTION 43
A SUT has an existing automated test suite.
Which of the following statements relating to the introduction of new features in the SUT is TRUE?

  • A. Automated tests are not affected by the introduction of a new feature and running them against the new SUT is a waste of effort
  • B. The test automation engineer should work with the business analysts to ensure the new feature is testable
  • C. It is generally more difficult to automate test cases for a new feature as the development has not yet started
  • D. The introduction of a new feature could require updates or additions to the testware components

Answer: A

 

NEW QUESTION 44
You are using a gTAA to create a TAS for a project. The TAS is aimed specifically at automating a suit of existing manual test cases for standalone desktop applications. All the interfaces between the TAS and SUT will be from the CUI of the application.
Which of the following layers of the gTAA should you focus on for the TAS?

  • A. The Test Definition layer
  • B. The test Generation layer
  • C. The Test Adaption layer
  • D. The Test Execution layer

Answer: B

 

NEW QUESTION 45
Which of thefollowingstatementsdoes NOT describe good practice for maintaining the TAS?

  • A. The TAS must consist ofcomponents that can be easily replaced without affecting the overallbehavior of the TAS itself
  • B. The TAS must be under configuration management, along with the test suite,the testware artefacts and the test environment in which it runs
  • C. The TAS must separate the test scripts from the environment in which it runs and from the associated harnesses and artefacts
  • D. The TAS must run in the development environment because development and programming knowledge are required for its maintainability

Answer: D

 

NEW QUESTION 46
Which of the following success factors for a test automation project is TRUE?

  • A. Automated tests that fail due to changes in the requirements of the SUT should be promptly fixed rather than disabled from the test suite
  • B. The test cases to be automated first must always be selected based on the number of times a test will need to be run
  • C. The test cases to be automated must have a high dependency on particular data values
  • D. Automated tests must be designed to capture only the data that is strictly needed for comparing expected and actual results

Answer: A

 

NEW QUESTION 47
Which of the following BEST describes why it is important to separate test definition from test execution in a TAA?

  • A. It allows developing steps of the test process without being closely tied to the SUT interface.
  • B. It allow choosing different paradigms (e.g event-driven) for the interaction TAS and SUT
  • C. It allows testers to find more defects on the SUT
  • D. It allows specify test cases without being closely tied to the tool to run them against the SUT

Answer: C

 