Real SAP C-TSCM42-64 practice exam questions for easy pass!
Updated: Jul 30, 2026
No. of Questions: 80 Questions & Answers with Testing Engine
Download Limit: Unlimited
Our SAP C-TSCM42-64 study material is researched and written by the experts who acquaint with the knowledge in the actual test. The accurate and verified answers can help you prepare well for the actual test. Besides, you can try C-TSCM42-64 free demo questions to assess the validity of it.
itPass4sure has an unprecedented 99.6% first time pass rate among our customers.
We're so confident of our products that we provide no hassle product exchange.
| Certification Vendor: | SAP |
| Exam Name: | SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 |
| Exam Number: | C_TSCM42_64 |
| Exam Format: | Multiple Choice, Multiple Response, Scenario-based Questions |
| Real Exam Qty: | 80 |
| Passing Score: | 65% |
| Related Certifications: | SAP Certified Application Associate - Production Planning & Manufacturing (SAP ERP) SAP Certified Application Associate - SAP S/4HANA Production Planning |
| Exam Price: | Varies by region (~USD 500) |
| Exam Duration: | 180 minutes |
| Certificate Validity Period: | No formal expiration (legacy certification validity may vary) |
| Available Languages: | English, German |
| Sample Questions: | SAP C-TSCM42-64 Sample Questions |
| Exam Way: | Online proctored exam via SAP Certification Hub or authorized test centers |
| Pre Condition: | Basic knowledge of SAP ERP systems and manufacturing/production planning processes is recommended |
| Official Syllabus URL: | https://www.sap.com/training-certification.html |
| Section | Objectives |
|---|---|
| Capacity Planning and Shop Floor Control | - Shop Floor Execution
|
| Production Orders and Execution | - Goods Movements
|
| Material Requirements Planning (MRP) | - MRP Execution
|
| Enterprise Structure in Production Planning | - Organizational Units in SAP ERP
|
| Integration with Other SAP Modules | - MM Integration
|
| Demand Management and Planning | - Sales and Operations Planning (SOP)
|
| Master Data for Production Planning | - Work Centers and Routings
|
1. Which of the following master data do you need to provide for process manufacturing?
(Choose three.)
A) Product cost collector
B) Production versions
C) Resources
D) Serial numbers
E) Master recipe
2. In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to?
A) In the course of basic dates scheduling with requirements planning, dependent requirements request the components from the bill of materials at the wrong times.
B) Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
C) Lead time scheduling, which occurs by the time that a planned order is converted into a production order (at the latest), cannot take place on the basis of incorrect basic dates.
D) Requirements planning runs up against an exception message in basic dates scheduling because the material master parameters do not match the scheduling result from the routing.
3. Which of the following activities is necessary for the capacity availability check to be carried out automatically when a production order is released?
A) Activate the availability check and assign an availability checking group to the material master for the product to be produced.
B) Activate the availability check and assign the check control to the plant.
C) Activate the availability check and assign a checking rule to the work center for the operation to be checked.
D) Activate the availability check and assign an overall profile in check control for the business function order release.
4. A user has entered planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a product. For the coming months, requirements with requirement type LSF (derived from the main strategy 10) have been planned. The user would like to change the requirement type from LSF to VSF planning with final assembly (in accordance with planning strategy 40) for requirements in the production plan that have already been saved.
Which of the following statements are applicable in this case? (Choose two.)
A) The user can enter the new planning strategy group 40 in the material master of the product, but the requirement type is not changed automatically for existing requirements.
B) The user has to change the requirement type for planning strategy 10 to VSF planning with final assembly in Customizing. The requirement type for all existing requirements is then changed automatically.
C) The planning strategy group can be changed from 10 to 40 in the existing production plan, and the requirement type for all requirements is changed automatically.
D) The present requirement for the product can be changed manually from LSF to VSF in the Requirement Type field in the production plan, so that the new strategy 40 determines the next planning operation.
5. A customer has been using planning strategies 30 (production by lots) and 10 (anonymous make-to-stock production) in SAP ECC. The customer wishes to move in part to planning strategy 40 (planning with final assembly). The issue of consumption has an effect here for the first time.
Which properties apply for consumption with planning strategy 40? (Choose two.)
A) Consumption can result in the subsequent specification and adjustment of planning elements in terms of quantity and date, by means of customer orders that arrive.
B) Consumption creates a static and binding assignment, between the planned independent requirements recorded in advance and the customer requirements that arrive, for the entire procurement process.
C) Consumption can reduce the originally planned production quantity.
D) Consumption can lead to an increase of the originally planned overall production quantity.
Solutions:
| Question # 1 Answer: B,C,E | Question # 2 Answer: A | Question # 3 Answer: D | Question # 4 Answer: A,D | Question # 5 Answer: A,D |
After practicing with C-TSCM42-64 students trust level increases and he gets ready for taking C-TSCM42-64 exam confidently.
All good
Hello, just cleared C-TSCM42-64 exam.
C-TSCM42-64 exam is my next one.
C-TSCM42-64 is a difficult test but your material is very helpful to understand C-TSCM42-64 parts especially analytical reasoning.
C-TSCM42-64 exam preparatory tools were a real help while preparing for my SAP certification exam.
92% of the test had questions exactly word for word from this dump.
Disclaimer Policy: The site does not guarantee the content of the comments. Because of the different time and the changes in the scope of the exam, it can produce different effect. Before you purchase the dump, please carefully read the product introduction from the page. In addition, please be advised the site will not be responsible for the content of the comments and contradictions between users.
itPass4sure offers the most current and accurate practice questions you are looking for. Our C-TSCM42-64 exam materials are not only the best option for certification but also enhances your skill to an advance level. Use our C-TSCM42-64 tutorial study material and get ready to pass the certification exam on the first try.
In addition, we have the money back guarantee on the condition of failure. You just need to show us the failure score report and we will refund you after confirming.
Test Engine: C-TSCM42-64 study test engine can be downloaded and run on your own devices. Practice the test on the interactive & simulated environment.
PDF (duplicate of the test engine): the contents are the same as the test engine, support printing.
You will receive an email attached with the C-TSCM42-64 study material within 5-10 minutes, and then you can instantly download it for study. If you do not get the study material after purchase, please contact us with email immediately.
We offer some discounts to our customers. There is no limit to some special discount. You can check regularly of our site to get the coupons.
Yes, you will enjoy one year free update after purchase. If there is any update, our system will automatically send the updated study material to your payment email.
Online Test Engine can supports Windows / Mac / Android / iOS, etc., because it is the software based on WEB browser. You can use it on any electronic device and practice with self-paced.
Online Test Engine supports offline practice, while the precondition is that you should run it with the internet at the first time.
Self Test Engine is suitable for windows operating system, running on the Java environment, and can install on multiple computers.
PDF Version: can be read under the Adobe reader, or many other free readers, including OpenOffice, Foxit Reader and Google Docs.
Once download and installed on your PC, you can practice C-TSCM42-64 test questions, review your questions & answers using two different options 'practice exam' and 'virtual exam'.
Virtual Exam - test yourself with exam questions with a time limit.
Practice Exam - review exam questions one by one, see correct answers.
All the products are updated frequently but not on a fixed date. Our professional team pays a great attention to the exam updates and they always upgrade the content accordingly.
Yes. We have the money back guarantee in case of failure by our products. The process of money back is very simple: you just need to show us your failure score report within 60 days from the date of purchase of the exam. We will then verify the authenticity of documents submitted and arrange the refund after receiving the email and confirmation process. The money will be back to your payment account within 7 days.
Over 70138+ Satisfied Customers